Door Schedule
May 1, 2008
The door schedule is set up to insert the information of each door that you have selected to be “on schedule” in the master file.
*THE ONLY WAY YOU CAN EDIT A DOOR SCHEDULE IS BY CHANGING THE INFORMATION IN EACH INDIVIDUAL DOOR, NOT THROUGH THE SPREADSHEET.
· The door schedule is premade on the VectorWorks Standards Sheet A601.
· Import your masterfile into the “master” design layer.
· Double click on the schedule already in the design layer, click the down arrow button, and select “recalculate” (the first option). This should add all the doors selected to be on the schedule in the masterfile.
· If the numbers are not in numerical order, click on one of the door numbers and you should see the buttons in the top left corner highlight. Click and drag the ascending button and drop it in the door number column.
Entering Information:
· Double click on the door and door settings will pop up
· Click the data tab
· Check “on schedule”
· Put the door number in the ID Label box
· Bubble shape – “Round”
· Bubble size – 5/16”
· ID Class – Anno-Iden (this allows you to turn off the tags without turning off the door itself)
· Check “Keep ID Horizontal”
· Schedule Info. – Fill in the following fields
5. Head Detail
6. Jamb Detail
14. Door Fire Rating
15. Notes
16. Door Material
19. Frame Type
20. Frame Material
24. User Field 1 = Door Type
25. User Field 2 = Glazing
26. User Field 3 = Hardware
o The door size will automatically be entered based on the info used when creating the door.
*Note: An easy way to copy the same door info for one door to another is with the “Eye dropper” tool. This will however map the same door number so you will have to change them back, but it’s easier than typing all the information again.